An independent power producer needed owner's representative, engineering review, commissioning supervision on a project with real consequences for schedule and cost. Energised on time with both packages in sync.
Challenge
Two turnkey contractors had to deliver the solar plant and the substation with aligned schedules and interfaces.
What we did
Design review, procurement monitoring, and supervision of construction and commissioning.
Result
Energised on time with both packages in sync.

Details
Project details
Client
An independent power producer
Location
Southeast Asia
Duration
2023–2025
Capacity
400 MWp · 220 kV substation · approx. €280m
Our role
Owner's representative, engineering review, commissioning supervision